Source: 1995 Aviation Capacity Enhancement Plan Online
Database
Last
updated September 9th, 1996.
http://asc-www.hq.faa.gov/Online_Database/Database.html
Section: Western Pacific Region: http://asc-www.hq.faa.gov/Online_Database/AWP.html
Page: http://204.108.10.43/Online_Database/SNA_Data.html
|
Construction: An extension of Runway 1L/19R is under consideration.
Notes:
|
Runway Data | ||
| Runway
|
Length (ft.)
|
Width (ft.)
|
|
| 1L/19R | 5700 | 150 | |
| 1R/19L | 2887 | 75 | |
|
|
|||
| Airport Statistics | |||
| Time Frame
|
Enplanements
|
Operations
|
|
| FY2010: | 8228000 | 631000 | |
| FY94: | 3281861 | 509220 | |
| FY93: | 2861867 | 494378 | |
| FY92: | 2769936 | 557442 | |
| FY91: | 2636331 | ||
|
|
|||
| Growth in:
|
Enplanements (%)
|
Operations (%)
|
|
| FY94-FY2010: | 150.71 | 23.92 | |
| FY93-FY94: | 14.68 | 3 | |
| FY92-FY93: | 3.32 | -11.31 | |
| FY91-FY92: | 5.1 | 1.2 | |
|
|
|||
| Time Frame
|
Delay Per 1,000 Ops
|
||
| CY94: | |||
| CY93: | |||
| CY92: | |||
| CY91: | |||
|
|
|||